Mondrian Build Manual

From RepRap
Revision as of 12:16, 30 October 2014 by Emmanuel (talk | contribs)
Jump to: navigation, search


Mondrian Documentation

Assembling and setting up the machine should take between 4h to 8h or two afternoons :) If you preassemble everything, or if you disassemble your machine for a travel, it should take 1h to put it back together.

<videoflash>QuMhb-vMsfw</videoflash>

Know the parts

Firstly, have a look at all the part and learn what everything is.

Base frame

Z-axis

Z-sliders

Z-drive

Bed

Top Frame

Y-axis

Panels

X-axis

Wiring

Calibration