P3Steel Y axis assembly

From RepRap
Revision as of 17:34, 21 November 2014 by AndrewBCN (talk | contribs)
Jump to: navigation, search

We'll do this in four easy steps:

  1. Y idler end assembly.
  2. Y motor end assembly.
  3. Y smooth rods and carriage installation.
  4. Y belt installation.

Each step requires 15~20 minutes, so set aside one evening for the Y axis assembly.


Y idler end assembly

For this step we require these tools (besides the M3 hey key we used to assemble the frame):

M8 hex key and 14mm wrench.


Y motor end assembly

For this step we require these tools (besides the M3 hey key we used to assemble the frame):

A small metal file and M3 hex key.


Y smooth rods and carriage installation

We need a small hammer (not kidding!) to gently (again, not kidding!) push the Y-axis smooth rods into their corresponding slots in the steel frame.

A small hammer.


Y belt installation

Y-axis assembly minus the GT2 belt.