Mondrian2.1 Build Manual

From RepRap
Revision as of 07:13, 4 March 2015 by Emmanuel (talk | contribs) (Base Frame)
Jump to: navigation, search


Mondrian Documentation

Assembling and setting up the machine should take between 4h to 8h or two afternoons :) If you preassemble everything, or if you disassemble your machine for a travel, it should take 1h to put it back together.

<videoflash>QuMhb-vMsfw</videoflash>

General tips

Read the whole manual once or twice before starting, to get an overview of the build

Know the parts

Firstly, have a look at all the part and learn what everything is.

How to insert a T-nut

T-nut insertion.jpg Tightening torque : 2.5 Nm (+/- 5%)

<videoflash>9CAiVmfO2mk|320|240</videoflash>

Base Frame

Mondrian2.1 base-corner v3.jpg

  1. base corners + belt
  2. base frame

Z-sliders

  1. nylon nut
  2. z-sliders
  3. z-profiles
  4. top corners
  5. two top profile

Z-drive

Bed

Y-sliders

Rear Panel

X-axis

X-endstop

Y-endstop

X-slider

Blower

Hotend

Wiring

Calibration