In this section I showing more or less how the mechanics should be assembled. This page was done by Tatubias. Please update with your images and better explanation text.

Here you can see more or less all the basics parts that you require. You can see all printed parts. also nuts, screws, rods, stepper motors, drivers, etc


Cyclone tutorial 1.jpg


First cut and drill the base. I did sent them to laser cut and laser drill to avoid misalignments. Then paint them with the color that you want. I used MDF wood. Glue with silicon Rubbers to avoid nuts scratch the table surface.

20150727 113351.jpg


Put the bolts and nuts to the 2 laterals and tighten them (not too much, we require them loose so later we can align all the machine).

20150727 113836.jpg


Then add the support for the Y axis

20150727 114241.jpg


Put nuts and bolt to the y rods support. Leave them somewhat loose so that you can align them with the machine structure.

20150727 114733.jpg

Note: here I recommend to install the end stop as it will be more complicated to do this later.


Get the plate where drilling will happen and add the supports for the pcb. Add the nuts to all the parts. In the back part add the support and the linear bearings. Do NOT tighten too much (this will be done later during alignment).

20150727 114917.jpg

20150727 115015.jpg

20150727 115034.jpg

20150727 115131.jpg


In the back part, now you will be installing the anti backslash system. Install the nuts and bolts. Don't tighten these too much either.


20150727 115437.jpg


Now we will assemble the y axis. In the picture below all the required parts are visible.

20150727 120201.jpg

20150727 120154.jpg


This is how it looks fully assembled from below.

20150727 120531.jpg


Mount the plate into the machine. Don't tighten the rods to the structure.

20150727 120841.jpg

Tighten all the nuts and bolts from the y axis

20150727 120645.jpg

20150727 120847.jpg

20150727 120908.jpg


Now its time to align the plate. Move the plate to one of the sides, then tighten all the nuts and bolts.

20150727 121229.jpg

Then move the plate to the other side and tighten all the nuts and bolts. If you did not add the end stop yet, add it now.

20150727 122832.jpg


So far we've assembled the base, the basic structure, and the y axis. Now it's time to assemble the X axis and the Y axis

Install the linear bearing on the X carriage and put in the nuts and bots. Don't tighten too much.

20150727 122918.jpg

20150727 122924.jpg


Now we will assemble the X axis.

20150727 132246.jpg

20150727 132249.jpg

20150727 132252.jpg


Install the rod into the structure. Don't tighten too much either.

20150727 133018.jpg

NOTE: do not install the nut in the picture below, it is not needed!

20150727 133029.jpg

20150727 133054.jpg

20150727 133046.jpg


This is how it looks now.

20150727 133214.jpg


Now it's time to mount the Z axis. Get the threaded rod for the Z axis, add 2 nuts, and mount it as on the photograph.

NOTE: The bottom nut is not needed, do not install it!


20150727 135737.jpg


Now add the bearing, and the other nut (ignore the bottom one in the picture!)

20150727 135955.jpg


Add the smooth rods.

20150727 140031.jpg


Mount the bearing and the linear bearing.

20150727 140617.jpg


Mount the motor, and mount all into the smooth rods

20150727 141113.jpg

20150727 141125.jpg

20150727 141150.jpg


Now install the gears.

20150727 141403.jpg

20150727 141423.jpg


Now add the gears for the x axis

20150727 142021.jpg


Add the covers for the gears.

800px


Now install the final endstop and we are done.

20150727 142612.jpg


Here are some pictures of the final assembly.

20150727 144702.jpg

20150727 144745.jpg

20150727 144803.jpg

20150727 144745.jpg